0
Home Shop Hotel & Banquet Chandeliers Pendants & Ceiling Lights Wall Sconces & Picture Lights Crystal Chandeliers Contact Blog Buying Guide Cart (0)
The Factory

Built on the Factory Floor.

Five production lines and 200+ craftspeople in Guzhen, China — and a QC process built for fixtures that have to be perfect on opening night.

Our facility is in Guzhen, Zhongshan, Guangdong, established in 2014 with five production lines and 200+ staff. Fabrication coordination, finishing, wiring, final assembly, functional testing and export packing are handled at our facility, with materials and selected components sourced through long-term partner factories and specialist subcontractors — standard practice for project lighting at this scale.

2014Established
200+Skilled Staff
5Production Lines
200+Hospitality Projects
11Countries Served
Facility & Capacity

A factory team built for project lighting.

Our team in Guzhen manages fabrication coordination, finishing, wiring, final assembly, testing and export packing for chandeliers, pendants, wall sconces and ceiling lights. Each fixture is assembled, tested and packed here before shipment, with materials and selected components sourced through qualified supplier partners.

Production capacity and lead time are confirmed by product, quantity, finish and project requirements. We provide the agreed production plan before an order is confirmed.

  • CNC machining & laser cutting for custom frames
  • Brass, copper, bronze, nickel, chrome finishing lines
  • Glass: crystal, opal, ribbed, tinted — sourced & quality-checked
  • LED driver integration (0-10V, DALI, Tuya, TRIAC)
Production Process

Eight stages between your drawing and your door.

01

Material Incoming

Brass, copper, steel, glass and LED drivers inspected against ISO sampling on arrival.

02

Fabrication

CNC cutting, bending and welding. Custom frames follow your CAD file to ±0.5 mm.

03

Polishing

Every surface hand-polished to your finish spec — mirror, satin, antique or patina.

04

Finishing

Electroplating and powder coating with a 72-hour salt-spray check on plated parts.

05

Wiring & Assembly

Certified wiring harnesses, thermal-tested drivers, polarity-checked sockets.

06

Functional Test

100% burn-in test: voltage stability, dimming response, polarity and insulation.

07

QC Inspection

AQL 2.5 pre-shipment inspection with photo report sent to you before packing.

08

Export Packing

Flight-case or foam-injected cartons, humidity film, corner protectors, palletised.

Quality Control

Inspections you can verify — not just promises.

100% Burn-in Test

Every fixture runs a full functional test before packing — no sample-based shortcuts.

AQL 2.5 Pre-shipment

Independent-style inspection with a photo and video report sent 48h before shipping.

Third-party Ready

Your own inspector (SGS, TÜV, Bureau Veritas) is welcome on-site at any stage.

Product-based Warranty

Warranty terms are confirmed by product. Most products are covered for 1–2 years, depending on the fixture and configuration.

Certification by marketCE / UL / RoHS on requestConfirmed per order

Every order leaves our facility export-packed and delivered to your nominated China port. International freight, customs clearance, import duties and local taxes are quoted separately, so you can use your own forwarder or ask us for a reference quote. See the full breakdown of what our product prices include, or read how certification documentation is arranged per order.

Factory Questions

Common questions about our facility.

Where is the factory, and what is handed over at the port?

Our facility is in Guzhen, Zhongshan, Guangdong, China. Every order is export-packed and delivered to your nominated China port. From there your own forwarder takes over, or we provide a reference freight quote for you to compare.

Which stages happen at your own facility?

Fabrication coordination, finishing, wiring, final assembly, functional testing and export packing are handled at our facility. Materials and selected components are sourced through long-term partner factories and specialist subcontractors, which is normal practice for project lighting.

What testing does each fixture pass before packing?

Every fixture runs a full functional burn-in test covering voltage stability, dimming response, polarity and insulation, followed by an AQL 2.5 pre-shipment inspection with a photo and video report sent to you before packing.

Can I send my own inspector or appoint a third party?

Yes. Your own QC team or an appointed third party such as SGS, TÜV or Bureau Veritas is welcome on-site at any stage of production.

How is a fragile chandelier packed for export?

Packing is specified for the fixture and shipping method — foam-injected cartons or flight cases, humidity film, corner protection and palletisation, with crystal and glass parts packed and labelled separately.

See the Workshop

Arrange a factory visit or video walkthrough.

We host buyers and their QC teams on-site every month. Can't travel? We'll walk the lines live on video — unedited.

Book a Factory Tour →