Buying from Our China Factory, made simple.
Every product shows its price, minimum order quantity and delivery to your China port — all in plain language. This guide walks you through pricing, production times and shipping, step by step.
One transparent price per piece.
No tier tables, no "contact us for pricing". Here is how the price on every product card works:
The big number is the price you pay
Every product shows its order price per piece. For most fixtures one piece is one complete lamp; on a small number of products — for example an art installation priced per individual element — the product page states that the price covers one element rather than a finished fixture. The number you order is up to your design.
Every product has its own MOQ
The MOQ badge tells you the minimum quantity you can order. Add that many or more — the cart won't accept less.
China port delivery is included
Quality control, export packing and delivery to the port you choose (Shenzhen, Shanghai, Ningbo…) are all part of the price. Freight and customs come next, quoted on request. See the full breakdown of what a product price includes. Not sure which delivery model suits your project? Compare China port delivery vs door-to-door.
A clear product price, with clear cost boundaries.
The product price covers everything we control, and the international leg stays visible so you can compare it. Read the detailed guide to what a Staylighting product price includes. Then compare your freight options: how to read and compare freight quotes, and whether you can use your own forwarder.
Included in every price
Already covered — nothing to pay extra for.
- The product at the order price shown
- Factory quality control & inspection before shipping
- Export-grade packing & palletising
- Domestic delivery to your designated China port
- Certification requirements confirmed by market and product configuration
Arranged next, on request
We quote them on request — or you arrange them yourself.
- International freight & door-to-door delivery
- Customs clearance, import duty, VAT & broker fees
- Samples before bulk production (7-day dispatch)
- Custom OEM design & white-label packaging
- Project-specific finishes & sizing
From your order to your port, in four steps.
Step 1Pick your pieces
Browse the catalog and add the products you need. Every card shows the price, MOQ and lead time.
Step 2Check out
At checkout, choose whether we quote international freight and customs for you, or you arrange your own forwarder.
Step 3We produce and deliver
After payment, we produce your order with quality checks at every stage, then deliver it to your China port.
Step 4Ship onward
Your forwarder collects from the port — or we handle the international leg and confirm the total with you before dispatch.
How long will my order take?
Samples ship in 5–7 working days on stocked finishes, after payment — the fastest way to check quality and finish.
Standard catalog orders take 20–45 working days, depending on quantity and finish.
Custom projects take 45–75 working days from sample approval, including prototyping.
Planning a bigger project? Let's talk.
For hotels, restaurants, importers and brands: volume pricing, custom finishes and full OEM manufacturing — with one dedicated contact from first sketch to final shipment.
- Volume pricing and consolidated freight for multiple products
- Custom sizes, finishes and your branding (NDA protected)
- A dedicated project manager and material samples
- OEM orders start at 20 pieces or USD 5,000
Certification planned for your market.
European Projects
Requirements confirmed for the destination market.
North American Projects
Requirements confirmed for the product configuration.
Material Compliance
RoHS test reports supplied with the CE documentation set — same test run as LVD and EMC.
China Market
Requirements reviewed for domestic-market projects.
Certification for CE, UL, RoHS, UKCA, SAA, SASO, SONCAP and PVoC is supplied to the destination market requirement and stated on your quotation. See how certification is supplied to your market.
Frequently asked questions.
Every product shows its own MOQ badge — from 2 pieces on most fixtures to 50 on large project chandeliers. Add at least that many; the cart will not accept fewer. Custom OEM starts at 20 pieces or USD 5,000.
Prices include delivery to your designated China port. International freight, customs and duties are extra — at checkout choose "quote freight & customs for me", or arrange your own forwarder. See the full price and freight breakdown.
Samples ship in 5–7 working days on stocked finishes. Bulk production takes 20–45 working days; large OEM projects run 45–75 working days from sample sign-off.
Yes. Samples ship in 5–7 working days on stocked finishes. We charge 1.3× the unit price; if you place a bulk order within 90 days the sample amount is credited back.
Yes — we are an ODM/OEM factory with 200+ staff. Custom design, prototyping, mass production and white-label packaging, all under NDA. Start from your sketch or spec.
T/T is most common: ≤ USD 5,000 paid upfront; USD 5,000–50,000 with 50% deposit; USD 50,000+ on 30/60/10. L/C at sight available above USD 50,000. Stripe / PayPal up to USD 20,000.
Still have questions? Ask us directly.
We reply within one business day. Tell us your country, quantity and target date, and we'll include a freight estimate.
Send your enquiry
Fields marked * are required. Prefer email? Write to us directly.