0
Home Shop Hotel & Banquet Chandeliers Pendants & Ceiling Lights Wall Sconces & Picture Lights Table & Floor Lamps Mirror & Vanity Lights Crystal Chandeliers Contact Blog Buying Guide Cart (0)
The Factory

Built on the Factory Floor — China Lighting Manufacturer in Guzhen, Zhongshan

Five production lines and 200+ craftspeople in Guzhen, China — and a QC process built for fixtures that have to be perfect on opening night.

Our facility is in Guzhen, Zhongshan, Guangdong, established in 2014 with five production lines and 200+ staff. Fabrication coordination, finishing, wiring, final assembly, functional testing and export packing are handled at our facility, with materials and selected components sourced through long-term partner factories and specialist subcontractors — standard practice for project lighting at this scale.

2014Established
200+Skilled Staff
5Production Lines
200+Hospitality Projects
11Countries Served
Facility & Capacity

A factory team built for project lighting.

Our team in Guzhen manages fabrication coordination, finishing, wiring, final assembly, testing and export packing for chandeliers, pendants, wall sconces and ceiling lights. Each fixture is assembled, tested and packed here before shipment, with materials and selected components sourced through qualified supplier partners.

Production capacity and lead time are confirmed by product, quantity, finish and project requirements. We provide the agreed production plan before an order is confirmed.

  • CNC machining & laser cutting for custom frames
  • Brass, copper, bronze, nickel, chrome finishing lines
  • Glass: crystal, opal, ribbed, tinted — sourced & quality-checked
  • LED driver integration (0-10V, DALI, Tuya, TRIAC)
Five Lines, One Workshop

Five production lines, organised by product family.

Each line carries the full vertical sequence — frame, finishing, wiring, assembly, test, packing — so one team owns a fixture from frame to carton. An order does not move between buildings or between subcontractors.

Hotel & banquet chandeliers

Large-format, multi-tier frames for lobbies, ballrooms and banquet halls — the line that carries most project orders.

Nordic & Scandinavian pendants

Clean silhouettes, opal and ribbed glass, brushed brass and powder-coated steel.

Vintage & retro pieces

Patina finishes, aged brass and copper, hand-finished against a signed-off reference sample.

Crystal chandeliers

Frame-and-strand assembly, crystal sorting and colour matching before the fixture is hung for burn-in.

Wall sconces and ceiling lights run through the same fabrication and finishing sequence on the same floor, so a corridor sconce and a ballroom chandelier leave with the same colour and the same packing standard.

Three in-house capabilities decide what is possible on those lines: finishing in brass, copper, bronze, nickel and chrome; glass sourcing from crystal to opal, ribbed and tinted, quality-checked on arrival; and LED driver integration for 0-10V, DALI, Tuya and TRIAC control. When a designer asks for a patina that is not in the catalogue, the finishing line is where it gets made.

Which line an order runs on matters less than what every line shares: the same QC gates, the same AQL 2.5 inspection, the same packing standard. A two-piece sample order and a 300-piece hotel project pass through identical checkpoints.

Production Process

Eight stages between your drawing and your door.

01

Material Incoming

Brass, copper, steel, glass and LED drivers inspected against ISO sampling on arrival.

02

Fabrication

CNC cutting, bending and welding. Custom frames follow your CAD file to ±0.5 mm.

03

Polishing

Every surface hand-polished to your finish spec — mirror, satin, antique or patina.

04

Finishing

Electroplating and powder coating with a 72-hour salt-spray check on plated parts.

05

Wiring & Assembly

Certified wiring harnesses, thermal-tested drivers, polarity-checked sockets.

06

Functional Test

100% burn-in test: voltage stability, dimming response, polarity and insulation.

07

QC Inspection

AQL 2.5 pre-shipment inspection with photo report sent to you before packing.

08

Export Packing

Flight-case or foam-injected cartons, humidity film, corner protectors, palletised.

Quality Control

Inspections you can verify — not just promises.

100% Burn-in Test

Every fixture runs a full functional test before packing — no sample-based shortcuts.

AQL 2.5 Pre-shipment

Independent-style inspection with a photo and video report sent 48h before shipping.

Third-party Ready

Your own inspector (SGS, TÜV, Bureau Veritas) is welcome on-site at any stage.

Product-based Warranty

Warranty terms are confirmed by product. Most products are covered for 1–2 years, depending on the fixture and configuration.

Certification by marketCE / UL / RoHS on requestConfirmed per order

Every order leaves our facility export-packed and delivered to your nominated China port. International freight, customs clearance, import duties and local taxes are quoted separately, so you can use your own forwarder or ask us for a reference quote. See the full breakdown of what our product prices include, or read how certification is supplied to your market.

Factory Questions

Common questions about our facility.

Where is the factory, and what is handed over at the port?

Our facility is in Guzhen, Zhongshan, Guangdong, China. Every order is export-packed and delivered to your nominated China port. From there your own forwarder takes over, or we provide a reference freight quote for you to compare.

Which stages happen at your own facility?

Fabrication coordination, finishing, wiring, final assembly, functional testing and export packing are handled at our facility. Materials and selected components are sourced through long-term partner factories and specialist subcontractors, which is normal practice for project lighting.

What testing does each fixture pass before packing?

Every fixture runs a full functional burn-in test covering voltage stability, dimming response, polarity and insulation, followed by an AQL 2.5 pre-shipment inspection with a photo and video report sent to you before packing.

Can I send my own inspector or appoint a third party?

Yes. Your own QC team or an appointed third party such as SGS, TÜV or Bureau Veritas is welcome on-site at any stage of production.

How is a fragile chandelier packed for export?

Packing is specified for the fixture and shipping method — foam-injected cartons or flight cases, humidity film, corner protection and palletisation, with crystal and glass parts packed and labelled separately.

See the Workshop

Arrange a factory visit or video walkthrough.

We host buyers and their QC teams on-site every month. Can't travel? We'll walk the lines live on video — unedited.

Book a Factory Tour →